In 2023 we completed a full earthworks and landscaping package which included significant earthworks to prepare for and lay 600m2 of turf, soft scaping the boundary of the property which included garden edging and plant installation, installation of a retaining wall and daily maintenance after handover.
We assisted a local plumbing company with the removal of existing concrete tanks and installation of new plastic tanks at the People First Stadium.
In 2024 we worked with a local concreter to remove 320m2 of concrete. We organised for the concrete to be cut, and used an 8T excavator and two 10m tippers on turnaround to remove the concrete from site. This project also required daily traffic control for the front road. We then prepped the areas to allow for new concrete.
We worked with a local landscaping company to spread 600 cubic metres of topsoil to prepare for new turf. This project included project managing the trucks importing the soil, and ensuring the project was completed to the agreed time frame for turf delivery.
In 2023 we installed a stormwater device in Coombabah which required intricate planning to allow for deep excavation and confined space while working with the public.
For 1.5 years we regularly serviced many suburbs on the Gold Coast by vacuum excavating litter baskets inside stormwater drains. This recurring project allowed us to play our part in caring for our environment by protecting Gold Coasts waterways from rubbish.
We demolished sand pits, removed damaged garden beds, and installed fresh turf at two Gold Coast primary schools
We assisted with the installation of a bioretention basin at a primary school on the Gold Coast.